Website Administrator
Dredging: 2008-2012
Once the main structures had been put in place and / or repaired e.g. footpath, spill weirs, culverts etc. then thoughts turned to re-watering the section of the canal at… Read More »Dredging: 2008-2012
The Wharf: 2011-2013
One of the last structures to be re-built prior to the re-watering of the canal at Pewsham was The Wharf, situated just below Bottom Lock. There were few visible signs… Read More »The Wharf: 2011-2013
