Protect the Canal – Secure Its Future
WHITE HORSE RESERVOIR AND THE WILTS & BERKS CANAL
If the reservoir is built, the locks must be built with it!
WE Require a fully navigable canal to be incorporated into the reservoir scheme, extending from the Great Western Railway through to the River Thames, with the canal infrastructure constructed concurrently with the reservoir as an integral part of the development.
The Trust is neither supporting nor opposing the reservoir; if the reservoir is approved we are demanding that the navigable locks and associated canal works are designed, funded and constructed at the same time as the reservoir – not postponed until after it becomes operational.
A once-in-a-generation decision
The White Horse Reservoir is a nationally significant water infrastructure proposal south-west of Abingdon. Thames Water says it would hold approximately 150 billion litres of water and is intended to begin supplying water from around 2040.
Its proposed footprint overlaps the safeguarded route of the Wilts & Berks Canal. That means decisions being made through the Development Consent Order process could determine whether the canal can ever be restored as a continuous waterway between Wiltshire and the River Thames.
Our Position is Clear
We are neutral on the principle of the reservoir. But if it is built, the complete navigable canal – including the locks – must be built during the same construction programme. Water security must not come at the cost of permanently prejudicing another piece of nationally important infrastructure and more than 200 years of canal heritage.
A channel is not necessarily a restored canal
Current proposals indicate a water channel or diversion around the reservoir. However, the Trust’s technical assessment identifies essential works that must also be designed, funded and delivered if the route is to function as a navigable canal and active travel corridor.
- Four navigable locks and associated pump-back systems.
- Bridges with adequate headroom for boats, rather than low-level crossings.
- A durable, accessible towpath suitable for walking and cycling.
- Resolution of utility conflicts, including the gas main crossing.
- A deliverable canal crossing beneath the A34.
- A practical construction and materials strategy for the Oday Hill cutting.
- Guaranteed access, land and safeguards needed to complete and maintain the canal.
Why “we can finish it later” is not an answer
The locks must not be postponed until after the reservoir is operational. The Trust’s engineering material shows that lock construction could require excavations around 6–9 metres deep and up to 40–50 metres wide, close to the toe of an operational reservoir embankment. Carrying out those works later would be more difficult, more expensive and may not be permitted at all.
The Trust estimates that the reservoir’s current approach could impose around £144 million in additional costs across three main areas: outstanding canal works, the A34 crossing and management of excavated material at Oday Hill. It also raises a more fundamental risk: future access or approvals may not be available at all.
The Positive Case

More than a waterway
A properly restored canal would create a continuous green-and-blue corridor for local communities, wildlife and visitors. It can deliver far more than navigation alone:
- Traffic-free walking and cycling routes.
- New and connected wildlife habitats.
- Healthier lifestyles and improved mental wellbeing.
- Tourism, visitor spending and support for local businesses.
- Flood alleviation and water-management opportunities.
- Protection and interpretation of more than 200 years of local heritage.
- New places for volunteering, education and community activity.
A potential £27.5 million in annual benefit
Using Canal & River Trust’s 2024 national valuation methodology, the Trust has estimated the potential annual value of the approximately nine-mile reservoir-to-Thames canal project at £27.5 million in 2025 prices:
| Potential annual benefit | Trust estimate |
|---|---|
| Economic value (GVA) | £7.7m |
| NHS savings through physical activity | £5.4m |
| Mental health and wellbeing value | £14.4m |
| Combined potential benefit | £27.5m |
The Choice
Build the locks and complete canal solution as part of reservoir construction – or risk leaving future generations with an unfinished route, a much larger bill and works that may be practically impossible to deliver.