    Sadly there is limited written information about some of the activities that took place along the canal so it came as something of a surprise for the early restoration volunteers to unearth what appeared to be the remains of a dry dock at Pewsham. It is situated next to Bottom Lock within the pound that stores water between Middle and Bottom Locks.

    Dry Dock 1 2002 Dec 

    Initial excavations in 2003 uncovered parts of the dock walls, the brick floor (with pitch on the floor in places showing where it had dropped off boats bottoms during works and repairs), the water outlet (used to drain the dock) and also some slate tiles indicating that the dock had a tiled roof.

     

     

    Dry Dock 2 2003 Feb

    Dry Dock 3 2002 Dec Water Outlet note roof slates 1

     

     

     

             

     

     

                                                                                                        

     

    In 2005 restoration work was started with parts of the dock walls rebuilt.

     Dry Dock 4 2005 Nov 1

    In addition the water drainage channel was unearthed and repaired

    Dry Dock 5 2005 Nov 2

     

                              Dry Dock 6 2005 Nov 3                                                

     

      

    Dry Dock 7 2005 Nov 4

    Dry Dock 8 2005 Nov 1a

     

     

     

     

     

     

     

     

     

     

     

     

     

                                                                                           

    Due to concentrating efforts on other parts of the canal little work was carried out to the Dry Dock for the next few years. However in 2013 the drainage channel was again unearthed and repaired with the stone slabs that covered the channel re-seated where required.

     

     

     Dry Dock 10 FromBreach towardsExitPortal2Dry Dock 9 FromBreach TwdsDDockEntrance OK

     

     

     

     

     

     

     

     

    Dry Dock 11 Entrance Down

    Dry Dock 12 Dock DrainageChannel ExitPortal3

     

     

     

     

     

     

     

                                                                                                                                                                                                                                          

    Finally the channel was covered in plastic sheeting for protection.

    Dry Dock 13 Dock DrainageChannel ReslabbedCovered

     

    Again a number of years drifted by as work on the dry Dock was limited due to more important work elsewhere on the canal. However in 2018 the Dry Dock restoration was finally incorporated into part of the plan for the Pewsham Locks area. The Dock would be rebuilt and would consist of a low brick wall (approximately 7 courses of bricks) with brick pillars that would support a tiled roof supported on wooden posts. The work would be completed as and when time and money were available.

    In 2019 work began on taking down the walls to sound footings ready for construction.

     

    Dry Dock 14 2019 1

    Dry Dock 15 2019 2 Dry Dock Pewsham 4 Jan 19

     

     

     

     

     

     

     

     

     

     

     

     

     

     

    Dry Dock 16 2019 3 Dry Dock Pewsham 5 Jan 19

    Dry Dock 17 2019 4 Dry Dock Pewsham 6 Apr 19

     

     

     

     

     

     

     

     

     

     

     

     

                                      

                          

     Dry Dock 22 Oct 1

                                                                                                                                                                                                                                             Dry Dock 23 Oct 2

     

     

     

     

     

     

     

    Mar 01

     

     

     Apr 01b

     

     

     

     

     

     

     

     

      By Spring 2022 the wall had been re-built. The next part of the project was to fit vertical metal posts that will support the oak posts that will support the roof. .

     

    Dry Dock 25 Sep 2021

    Dry Dock 26 Dec 2021

     

     

     

     

     

     

     

     

     

    Dry Dock 27 2018

    Dry Dock 28 Apr 2022

     

     

     

     

     

     

     

     

    The entrance to the Dry Dock from the Pound was also uncovered showing that it had been built with stone (much as the waiting wall) with presumably clay behind to ensure a water tight seal.

      

     Dry Dock 19 2019 5 Dry Dock Pewsham 7 Sep 19Dry Dock 18 2019 6 Dry Dock Pewsham 8 Sep 19

     

      

     

     

           

     

     

                                                                                     
    During the excavation some artefacts of pottery, glass and metal work were discovered.

     

    Dry Dock 20 2019 8

    dry Dock 21 2019 7

     

     

     

     

     

     

                                   

     

                      

     

    A schematic view of the Dry Dock is shown below

    Dry Dock 24 DryDock

     

    DD30DD31DD32DD33 First casting

     DD34 First Coping after former removedDD35 Grass cut in Dock

     

     DD36 East Wall looking NorthDD37 Pillar castingDD38 Dry Dock looking South

     

     Restoration Work continues ……