Dry Dock: 2018-present

Sadly there is limited written information about some of the activities that took place along the canal so it came as something of a surprise for the early restoration volunteers to unearth what appeared to be the remains of a dry dock at Pewsham. It is situated next to Bottom Lock within the pound that stores water between Middle and Bottom Locks.

Dry Dock 1 2002 Dec

 

Initial excavations in 2003 uncovered parts of the dock walls, the brick floor (with pitch on the floor in places showing where it had dropped off boats bottoms during works and repairs), the water outlet (used to drain the dock) and also some slate tiles indicating that the dock had a tiled roof.

Dry Dock 2 2003 Feb

Dry Dock 3 2002 Dec Water Outlet note roof slates 1

In 2005 restoration work was started with parts of the dock walls rebuilt. Due to concentrating efforts on other parts of the canal little work was carried out to the Dry Dock for the next few years. However in 2013 the drainage channel was again unearthed and repaired with the stone slabs that covered the channel re-seated where required.

Dry Dock 4 2005 Nov 1

 

In addition the water drainage channel was unearthed and repaired. Finally the channel was covered in plastic sheeting for protection.

Dry Dock 7 2005 Nov 4
Dry Dock 8 2005 Nov 1a

Dry Dock 10 FromBreach towardsExitPortal2
Dry Dock 9 FromBreach TwdsDDockEntrance OK
Dry Dock 11 Entrance Down
Dry Dock 12 Dock DrainageChannel ExitPortal3

Dry Dock 13 Dock DrainageChannel ReslabbedCovered

Again a number of years drifted by as work on the dry Dock was limited due to more important work elsewhere on the canal. However in 2018 the Dry Dock restoration was finally incorporated into part of the plan for the Pewsham Locks area. The Dock would be rebuilt and would consist of a low brick wall (approximately 7 courses of bricks) with brick pillars that would support a tiled roof supported on wooden posts. The work would be completed as and when time and money were available.

In 2019 work began on full restoration. Covid in 2020/21 delayed the work but the Dry Dock restoration was completed in 2025.