    Council depot

    We were granted planning permission in 2014 to extend the canal through the north side of the old depot and a ‘substantial start’ was made within the three-year time limit.

    Around that time, Wiltshire Council stated their intention to sell the site for development and for the Wilts & Berks Canal Trust to get the cleared site from any purchaser for £1. The Coronation Country Park Steering Group advocated that the depot site would make an excellent community asset.

    Wiltshire Council has now said that it won’t sell the depot until at least 2026. We heard it might become a household recycling centre. At a meeting before Christmas, Wiltshire Council stated that it planned to close two existing household recycling centres in 2026, and replace them with one site in the next few years.

    A further update on the depot site will follow, including a report from a Wiltshire Council area board meeting held in January.

    Templars Firs

    We’ve suffered persistent leaks around the Blockhouse at Templars Firs. Together with Robert Cox, a WBCT project manager from Abingdon, we’re looking at solutions to the problem, including the fact that steel piling and coir rolls have been used at Rushey Platt in Swindon. Robert prefers sheet steel piling in this particular case.

    Once Robert reports back, we must do something soon, as the leaks are continuous and likely to increase. There are also some worrying holes in the earth between the towpath and the bank.

    A member of the public has commented on the Templars Firs footbridge, parts of which need attention. Wiltshire Council have taken responsibility for the bridge and are due to inspect it.

    Work parties

    Most of the December work parties were at Templars Firs, where more of the muddiest sections of the northern path were made all-weather. The work pontoon was taken to Studley Grange and hidden in the Norfolk Reeds. At the far end of Studley Grange, a breakaway team tidied up the fallen tree at the far end, but it will need sawing up and transporting westward on the pontoon.

    At the first work party in January, the ice was two inches thick and the pontoon could not be used. However, the frozen conditions allowed much more progress to be made than expected. There was almost no ice for the second work party, although the pontoon was still slippery for the first hour. At the end of the day, the pontoon was hidden towards the end of the first straight.

    The work party has spent time at Seven Locks, where a local farmer has had concerns about flooding from water in the derelict canal. The work party cleared a blocked culvert to allow the water to flow and be safely redirected.

    The young volunteer from Cirencester College is enjoying the work parties and has been using hand tools.

    Trip boat Nonsuch

    The spare parts for Nonsuch’s engine have now been delivered to Alan Ward’s garage, while the injectors have been sent away for servicing. We hope they’ll be back in the boat in the next few weeks.  

    Steve Bacon