RWB Branch Work Party Update

    The canal at Templar’s Firs has a delightful footpath on the north side, which many visitors take for part of their walk. Parts of it can get muddy in winter, and in the past year some stretches have already been given all-weather surfaces.

    A lorry-load of aggregate was delivered on 3rd November ready for the work-party on the 5th November.

    That’s 19 tons piled-up near the slipway. How to get it where it will be needed without churning up the path? The Wednesday work-party used a pontoon, loaded with several tubs of aggregate.

    For most deliveries there were 9 tubs on the pontoon, towed by one volunteer along the towpath with another standing on the pontoon to steer it. That’s just like the old cargo boats from before 1914, without needing any fuel or propeller to help the vessel on its way. How green is that?

    The ponton was first hauled up on to the slipway. The tubs were carried three at a time to the pontoon.

    Each trip went under Noremarsh Footbridge before the pontoon was pushed to the north side for unloading. (Photo: Gareth Penn)

    By the end of the day, no fewer than 84 tubs had been shifted, most of them to this pile located near to the new bench. In future work-parties, other piles will be created further east beside muddy sections. (Photo: Gareth Penn)

    Royal Wootton Bassett work-parties meet every Wednesday. Would you like to join our ‘free gym’? If so, please contact ian.lazenby@wbct.org.uk for more details.

    (Photos by Steve Bacon, unless stated.)

    Written by Steve Bacon, Chair, Royal Wootton Bassett Branch.