October started with a drop of rain – but didn’t stop until the 4th, by which time over 120mm had fallen. All of the drainage ditches and streams overflowed into the canal as seen here from east to west. The water was too deep to walk from Harris Croft Farm onto the restored canal towpath at the east end of the Templar’s Firs section:


















