On the advice from the Trust engineer volunteers are incorporating a by-wash into the Waiting Wall at Pewsham between Bottom and Top Lock to ensure that excess water does not over-top the lock gates and potentially cause damage. Instead any excess water will flow through the spill weir and by-pass Bottom Lock and back into the canal.



