The Pewsham Locks site contains three locks, dry dock, saw pit, carpenters workshop and a lime kiln. Volunteers continue to fund raise and through the generosity of players of the Post Code Lottery and a grant from Chippenham Area Board over £120,000 was raised for Pewsham Locks projects. Additionally, through the generosity of the Wiltshire Community Foundation Chippenham Borough Lands Charity and the National Lottery, we also have funds to rebuild the Dry Dock and buy new tools and equipment.

The Western End
The line at the western end was one of the first stretches to be completed when the canal was built in 1797. We currently have work sites at Pewsham (Chippenham), Green Lane Farm / Pudding Brook (north of the A4 at Chippenham), Queenfield Farm (Melksham) and carry out biannual maintenance at Seven Locks (Lyneham).
Recent significant achievements at Pewsham include the restoration of the 30 metre long Cocklemore culvert, re-building the waiting wall in the lower pound, re-building the lock wing walls and the conversion of a narrow boat to a tug and butty. Current projects include re-building and restoration of the Dry Dock and a new accommodation over Top Lock.

Pewsham Locks Site
The main activity is at Pewsham Locks where we have dredged a large section – the longest section of navigable waterway on the Wilts & Berks. We are restoring a pocket of industrial archaeology.
We have planning permission for all the works at Pewsham Locks and are currently concentrating on getting all the relevant paperwork in place so that when opportunities arise we have spade-ready projects to go.
We have cleared an 800m stretch of canal north of the A4, which is now open to the general public and have recently acquired a lease on another 700m stretch north of the A4 which, when restored, will leave us some 50m short of the infamous Stanley Aqueduct.