Building the By-Wash between Middle and Bottom Lock (click on photographs to enlarge)
On the advice from the Trust engineer volunteers are incorporating a by-wash into the Waiting Wall at Pewsham between Bottom and Top Lock to ensure that excess water does not over-top the lock gates and potentially cause damage. Instead any excess water will flow through the spill weir and by-pass Bottom Lock and back into the canal.
Back to MCC Projects Main Page
Back to MCC Home Page